Detail Package

Procurement of Oxygen Tank 6 Metercube & Regulator

Project
SOPHI
Project Description
Strengthening of Primary Healthcare in Indonesia (SOPHI): a joint co-financing between WB, AIIB and ADB for the primary care component.
Package Name
Procurement of Oxygen Tank 6 Metercube & Regulator
Loan No.
IBRD (9626-ID), AIIB (P000787), ADB (4430-INO)
Activity Reference No.
ID-PMU SOPHI-435700-GO-RFB
Market Approach
National Open
Procurement Method
Request for Bids (RFB) - 1 Stage 2 Envelope (Rated Criteria)
Estimated Total Cost
$959,535.00
Currency
US Dollar
Stages
Unsuccesfull Package
Bid Submission Deadline
21 Nov 2024

Package Lot

Name Of Lots Units Amount
Lot 1: Oxygen Tank 6 Metercube & Regulator - Region Barat 1419 $430,335.00
Lot 2: Oxygen Tank 6 Metercube & Regulator - Region Timur 1745 $529,200.00

Documentation

Published Date Document Name
2024-10-31 Specific Procurement Notice - Procurement of Oxygen Tank 6 Metercube & Regulator
2024-10-31 Bidding Document - Procurement of Oxygen Tank 6 Metercube & Regulator
2024-10-31 Technical Specification - Procurement of Oxygen Tank 6 Metercube & Regulator
2024-11-19 1st Amendments to Bidding Document - Procurement of Oxygen Tank 6 Metercube & Regulator
2024-11-19 Technical Specification (Updated file as per the issued 1st Amendment to Bidding Document) - Procurement of Oxygen Tank 6 Metercube & Regulator
2024-12-21 Minutes of Prebid Meeting - Procurement of Oxygen Tank 6 Metercube & Regulator

Responses to Clarification of Bidding Document (Procurement of Oxygen Tank 6 Metercube & Regulator)

No. Date of Received Question Responses Part (RFB) Cluster Sub Cluster
1 2024-11-11 Selamat pagi,

Pada B.2. Memiliki pengalaman khusus, apakah menjalankan pekerjaan yang salah satu barangnya adalah tabung CO2 6m3 + troli dapat diperhitungkan?

Mohon tanggapan.

Salam
Sesuai dengan dokumen pemilihan, peserta harus memiliki pengalaman kontrak sebelumnya dalam penyediaan dan pemasangan peralatan Oxygen Tank 6 Metercube & Regulator dengan jumlah kumulatif minimal 1.582 unit per tahun, pada salah satu tahun dalam kurun waktu 7 (tujuh) tahun terakhir sebelum batas waktu pemasukan penawaran.

Jika peserta memiliki pengalaman dalam penyediaan tabung oksigen selain Oxygen Tank 6 Metercube & Regulator, pengalaman tersebut dapat diperhitungkan selama kode KBKI yang dimiliki sesuai dengan yang disyaratkan.
Supply Requirements Evaluation Process Specific Experience
2 2024-11-11 Selamat pagi,
mohon penjelasan berikut :

1. Syarat Kualifikasi Teknis Penyedia B.2)(a), untuk menjalankan pekerjaan tabung oxygen selain item Oxygen Tank 6 Metercube & Regulator apakah dapat diperhitungkan ?

Sesuai dengan dokumen pemilihan, peserta harus memiliki pengalaman kontrak sebelumnya dalam penyediaan dan pemasangan peralatan Oxygen Tank 6 Metercube &Regulator dengan jumlah kumulatif minimal 1.582 unit per tahun, pada salah satu tahun dalam kurun waktu 7 (tujuh) tahun terakhir sebelum batas waktu pemasukan penawaran.

Jika peserta memiliki pengalaman dalam penyediaan tabung oksigen selain Oxygen Tank 6 Metercube & Regulator, pengalaman tersebut dapat diperhitungkan selama kode KBKI yang dimiliki sesuai dengan yang disyaratkan.
Supply Requirements Evaluation Process Qualification Requirements
3 2024-11-11 2. Produk tabung, apakah sudah harus ada isi oksigen atau adakah kelengkapan Aksesori /Atribut item lain yang dibutuhkan ?

Terima kasih,
salam.
Terima kasih atas pertanyaan yang disampaikan, Alat Oxygen Tank 6 Metercube yang dikirimkan oleh penyedia dalam keadaan kosong. Penyedia dapat memberikan aksesoris/Atribut tambahan sesuai dengan spesifikasi di excel sheet termasuk misalnya selang regulator. Supply Requirements Evaluation Process Qualification Requirements
4 2024-11-11 Selamat Pagi,

Menurut RKS Data Personalia dan barang/perlengkapan tidak perlu disertakan, apakah benar?

Mohon tanggapannya, terimakasih..

Salam

Terima kasih atas pertanyaan yang disampaikan.
Benar, berdasarkan RKS, data terkait personalia dan barang/perlengkapan tidak perlu disertakan.
Supply Requirements Evaluation Process Qualification Requirements
5 2024-11-11 Output pressure: regulator shall deliver 30-50 psi, biasanya keluaran regulator satuannya adalah liter per menit (lpm), bukan psi. Apakah boleh dinyatakan dalam lpm saja?

Mohon arahan.

Jawab

Terimakasih atas pertanyaan yang disampaikan. Satuan Pound Per Inci Persegi (psi) dan Liter Per Menit (lpm) adalah pengukuran yang berbeda, spesfikasi teknis tetap dalam satuan psi.
Supply Requirements Evaluation Process Qualification Requirements
6 2024-11-11 Salam,

Disebutkan requirement Integrated Regulator: ...to facilitate delivery of low-flow oxygen (via selectable flow control) AND high-flow oxygen (via 50 psi outlet), mungkin maksudnya adalah:

...to facilitate delivery of low-flow oxygen (selectable flow control via 50 psi outlet) AND high-flow oxygen.

Mohon penerangan.

Terima kasih
Terima kasih atas pertanyaan yang disampaikan. Spesifikasi teknis yang dibutuhkan sesuai yang tertulis pada dokumen, "to facilitate delivery of low-flow oxygen (via selectable flow control) AND high-flow oxygen (via 50 psi outlet)". Supply Requirements Evaluation Process Qualification Requirements
7 2024-11-12 Yth. Pokja

Apakah perusahaan dengan kualifikasi usaha kecil boleh mengikuti pengadaan ini ?
Perusahaan dengan kualifikasi usaha kecil diperkenankan mengikuti tender ini sepanjang memenuhi persyaratan kualifikasi yang telah ditetapkan dalam dokumen pemilihan. Silahkan mengacu kepada Dokumen Pemilihan (Bab V. Lembar Data Kualifikasi) Bidding Procedure Procurement Regulations Eligible Bidders (including joint venture)
8 2024-11-13 Salam,

Permintaan material tabung adalah stainless / aluminium, dengan sertifikasi MRI compatible.

Pertanyaan: kalau bahannya aluminium, tetapi tanpa sertifikasi apakah bisa diterima?
apakah boleh kita tawarkan yang bahan lain (baja, tidak MRI compatible)

Apakah komponen lainnya (keran, regulator, trolley), harus ada sertifikasi MRI compatible juga?.


Terimakasih atas pertanyaan yang disampaikan. Penyedia wajib melampirkan sertifikat MRI Compatible sesuai kebutuhan di spesifikasi teknis.

Untuk komponen lainnya (keran, regulator, trolley) tidak harus ada sertifikasi MRI compatible.
Supply Requirements Evaluation Process Qualification Requirements
9 2024-11-14 selamat pagi,

Kami ijin bertanya :

1. Untuk mekanisme pembayaran seperti apa dan sumber pembayaran nya dari mana?
Terimakasih atas pertanyaan yang disampaikan. Kontrak ini dibiayai melalui APBN DIPA Satker Sekretariat Ditjen Kesmas No: SP DIPA024.03.1.465909/2024 tangggal 24 November 2023 yang bersumber dari Pinjaman Luar Negeri Bank Dunia (9626-ID), AIIB (P000787) dan ADB (4430-INO) yang tercantum dalam BAB XIII. RANCANGAN DOKUMEN KONTRAK dan Mekanisme pembayaran atas pelaksanaan pengadaan barang ini dilakukan sebagaimana yang ditetapkan dalam LDP dan BAB XII Syarat-syarat Khusus Kontrak (SSKK), klausal dalam SSUK 60. Contract Contract Management Payment Term
10 2024-11-14 2. Maintanance 5 tahun itu meliputi apa aja?

Terimakasih
Terimakasih atas pertanyaan yang disampaikan. Maintenance dalam masa 5 tahun yang diperlukan alat ini meliputi "inclusive of annual preventive maintenance and repair services; inclusive of all labor, parts, logistics and transportation; inclusive of all supplied items provided in the offer" Contract Contract Management Warranty

Contract Award Notice

No contract award notice uploaded for this lot.

No contract award notice uploaded for this lot.